View Single Post
 
Old 03-20-2022, 02:42 PM
rjccjr rjccjr is offline
Member
 
Join Date: Mar 2013
Location: Beverly, MA, USA
Posts: 330
Total Downloaded: 814.53 MB
CL-52 update

Hi All;

The weather deck finally fits. It is correct for length and beam. It is printed on card now and being tested to confirm the fit. It will be glued in place when the side plates are tested. There is still need for adjustment of deck fittings, but that's a situation which will continue as the design evolves. The sections are drawn in plain white and colored views on each page. There is still no final decision of the color scheme at this early stage.When everything is correct only the colored sections will remain. Everything on the deck is drawn in to simplify the placement of structures as the design matures. The first of eight side plates is now under development. That is going to take a lot of dry fitting.

Regards, rjccjr
Attached Thumbnails
USS Juneau CL-52-054.jpg   USS Juneau CL-52-056.jpg   USS Juneau CL-52-3-new-mid-fwd-3-20-22.jpg   USS Juneau CL-52-side-1-3-20-22.jpg  
Reply With Quote