CL-52 update
Hi All;
The bridge and pilot house areas have been redrawn and the fit adjusted. The flag bags are now in place. Detail items such as the fire director, some railings, peloruses, compass repeaters and searchlights are not yet in place, because drawings need to be backdated and adjusted. The first photo shows the old bridge area (on the right) in contrast with the revision. The other three show the revised configuration in place. Drawing has begun on the rear stack area.
Regards, rjccjr
|