Hello everybody,
and these
Mounts were glued today.
At it the most difficult step was pushing the
Handrail feet into the tiny mounts, which is why I "sharpened" them slightly. Then the gluing followed with
MEK by carefully wetting the mounts with the finest
red sable brush (10/0).
This also finished the third
Handrail pair,
and could be placed on the template for fitting.
It was finally the turn of the last couple,
whereby the whole set is finally complete.
And in this arrangement, all eight
Handrails could soon be glued to the canister, as well as the
Personnel door.
So that nothing happens to them until then, I quickly brought them to safety in this little box.
That's it then again.