View Single Post
 
Old 09-01-2023, 02:52 PM
gregoy's Avatar
gregoy gregoy is offline
Member
 
Join Date: May 2020
Location: São Paulo
Posts: 220
Total Downloaded: 25.61 MB
Sorry for the delay in updating the progress, but here I am:

I've made a significant progress on the model building, and since the progress covers a lot of steps; I'll be making a quick resume of what I did during these last days:
  1. Finished the wall butressess;
  2. Built 99% of the south tower base;
  3. Also built 99% of the north tower;

The only parts left to add to the south are parts that goes below the windows on each tower side, but they are for later in the number sequence.
North tower also has these same parts left, but also the top decoration is missing; it'll be added on the very end of the number sequence.

Below are photos of the towers; now I'll be making the smaller sructures that goes around the cathredral.

Cheers,

Gregory.
Attached Thumbnails
Stephandson in Wien - Schreiber Bogen-south_tower_base.jpg   Stephandson in Wien - Schreiber Bogen-north_tower.jpg  
Reply With Quote