Thread: Recessed plug
View Single Post
 
Old 03-18-2024, 11:25 AM
Siwi Siwi is offline
Member
 
Join Date: May 2012
Location: Southampton, birthplace of the Spitfire
Posts: 1,295
Total Downloaded: 136.69 MB
Option A isn't such a problem if the floor pieces are glued progressively as the upright tower is closed up. It doesn't eliminate the need to line up properly though. A better design solution would be attaching the floor to the inside of the tower top on one side, which then means it can be valley folded and attached to the other three tabs already joined.
__________________
Currently in the hanger: Thaipaperwork Martin B-26 'Flak-Bait'
In the shipyard: JSC barkentine 'Pogoria'
Recently completed: TSMC F-16, S&P Kawanishi N1K1 Kyofu diorama
Reply With Quote