#21
|
||||
|
||||
looing good Kurt
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#22
|
||||
|
||||
Thanks David
Continue with fourteen platforms G2 to G15 ... which are glued in one hour ... ... and glued on, ready for the next floor Sincerely Kurt |
#23
|
||||
|
||||
Good progress Kurt.
And an interesting build!
__________________
The SD40 is 55 now! |
#24
|
||||
|
||||
Even more nice build.
Keep up!
__________________
>-8 Live long and paper \\//_ |
#25
|
||||
|
||||
Thanks to Kevin and asettico
With each floor, the area of the cuboid becomes smaller and smaller ... while drying is weighted ... ... and then put on ... Now the platforms H1 to H15 ... ... and we are ready for you fourth level Sincerely Kurt |
Google Adsense |
#26
|
||||
|
||||
A whole bunch of wall pieces ... which are now higher than the previous ones ... ... and put on piece by piece ... to complete the fourth floor Sincerely Kurt |
#27
|
||||
|
||||
a lot of activity but few pictures ... Continue with the pedestals i 1 to i 5 ... which are glued on at the top Sincerely Kurt |
#28
|
||||
|
||||
Does this put you up to the first set of arches?
__________________
A fine is a tax when you do wrong. A tax is a fine when you do well. |
#29
|
||||
|
||||
Hello Vermin King ,
yes now I start with the first arches With part 1 I now start with the first part of the lower arch bridge ... whereby I only reinforce the middle area with 1.5 mm gray cardboard ... ... parts U1 to U5 well before rounding ... and first glue the straight flaps, now let them dry well Sincerely Kurt |
#30
|
||||
|
||||
good work on the arches Kurt
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
Google Adsense |
|
|