PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Architectural Models

Reply
 
Thread Tools Display Modes
  #21  
Old 12-26-2020, 04:11 AM
romanmodels's Avatar
romanmodels romanmodels is offline
Member
 
Join Date: Nov 2011
Location: Nr Devizes Wilts uk
Posts: 2,329
Total Downloaded: 14.63 MB
looing good Kurt
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9

Reply With Quote
  #22  
Old 12-29-2020, 01:18 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,124
Total Downloaded: 0
Thanks David

Continue with fourteen platforms G2 to G15 ... which are glued in one hour ...

... and glued on, ready for the next floor

Sincerely
Kurt
Attached Thumbnails
Segovia Aqueduct, Spain - Merino - 1: 125-dscf0010-2-.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0020.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0021.jpg  
Reply With Quote
  #23  
Old 12-29-2020, 02:02 AM
Kevin WS's Avatar
Kevin WS Kevin WS is offline
Eternal Member
 
Join Date: Aug 2010
Location: Currently Southern Africa.
Posts: 7,121
Total Downloaded: 425.92 MB
Good progress Kurt.

And an interesting build!
__________________
The SD40 is 55 now!
Reply With Quote
  #24  
Old 12-29-2020, 02:26 AM
asettico's Avatar
asettico asettico is offline
Member
 
Join Date: Sep 2017
Posts: 798
Total Downloaded: 133.91 MB
Even more nice build.
Keep up!
__________________
>-8 Live long and paper \\//_
Reply With Quote
  #25  
Old 01-01-2021, 12:08 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,124
Total Downloaded: 0
Thanks to Kevin and asettico

With each floor, the area of the cuboid becomes smaller and smaller ... while drying is weighted ...

... and then put on ... Now the platforms H1 to H15 ...

... and we are ready for you fourth level

Sincerely
Kurt
Attached Thumbnails
Segovia Aqueduct, Spain - Merino - 1: 125-dscf0022.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0023.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0024.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0047.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0048.jpg  

Reply With Quote
Google Adsense
  #26  
Old 01-05-2021, 10:52 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,124
Total Downloaded: 0


A whole bunch of wall pieces ... which are now higher than the previous ones ...

... and put on piece by piece ... to complete the fourth floor

Sincerely

Kurt
Attached Thumbnails
Segovia Aqueduct, Spain - Merino - 1: 125-dscf0049.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0050.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0051.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0052.jpg  
Reply With Quote
  #27  
Old 01-07-2021, 10:02 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,124
Total Downloaded: 0


a lot of activity but few pictures ...

Continue with the pedestals i 1 to i 5 ... which are glued on at the top

Sincerely
Kurt
Attached Thumbnails
Segovia Aqueduct, Spain - Merino - 1: 125-dscf0053.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0054.jpg  
Reply With Quote
  #28  
Old 01-07-2021, 10:34 AM
Vermin_King's Avatar
Vermin_King Vermin_King is offline
Member
 
Join Date: Jun 2011
Location: Kansas City
Posts: 11,583
Total Downloaded: 582.17 MB
Does this put you up to the first set of arches?
__________________
A fine is a tax when you do wrong.
A tax is a fine when you do well.
Reply With Quote
  #29  
Old 01-09-2021, 01:13 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,124
Total Downloaded: 0
Hello Vermin King ,
yes now I start with the first arches

With part 1 I now start with the first part of the lower arch bridge ... whereby I only reinforce the middle area with 1.5 mm gray cardboard ...

... parts U1 to U5 well before rounding ... and first glue the straight flaps, now let them dry well

Sincerely
Kurt
Attached Thumbnails
Segovia Aqueduct, Spain - Merino - 1: 125-dscf0013.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0014.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0015.jpg   Segovia Aqueduct, Spain - Merino - 1: 125-dscf0016.jpg  
Reply With Quote
  #30  
Old 01-09-2021, 04:19 AM
romanmodels's Avatar
romanmodels romanmodels is offline
Member
 
Join Date: Nov 2011
Location: Nr Devizes Wilts uk
Posts: 2,329
Total Downloaded: 14.63 MB
good work on the arches Kurt
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9

Reply With Quote
Google Adsense
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 05:27 PM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com