#1
|
||||
|
||||
Pont du Gard Schreiber 1: 300
Here are a few impressions of my newest model.
A. Pirling |
Google Adsense |
#2
|
||||
|
||||
That's pretty nice, lovely to look at...
__________________
Replicating Excellence-> https://ecardmodels.com/vendors/replicating-excellence |
#3
|
||||
|
||||
Very nice indeed.
__________________
Give me a pigfoot and a bottle of beer. On Flickr: https://www.flickr.com/photos/153077...57692694097642 |
#4
|
||||
|
||||
Beautiful building, thanks for sharing!
__________________
>-8 Live long and paper \\//_ |
#5
|
|||
|
|||
This must have been a real challenge that you have truly mastered. An excellent build, congratulations.
|
Google Adsense |
#6
|
||||
|
||||
good work Pirling
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#7
|
||||
|
||||
Beautiful work! This is a huge model, must be around 1m wide, I remember from seeing in the Schreiber catalog. What a magnificent structure by the way. The Romans were quite ingenious.
Regards, Erik |
#8
|
||||
|
||||
It is certainly one of the most beautiful and impressive of the Roman structures.
Your model is outstanding. Don |
#9
|
||||
|
||||
Thank you very much for your kind words .
Indeed, both the original and model of the bridge are impressive. Here are a few photos of the bridge over the Garond that I was able to take in 2012.* |
#10
|
||||
|
||||
I'm watching a broadcast that talks about Pont du Gard Schreiber, among other things. I paid attention to it precisely for your construction.
Great building, the real one and the model
__________________
>-8 Live long and paper \\//_ |
Google Adsense |
|
|