#1
|
||||
|
||||
Mole Antonelliana , Torino / Italia - Domus - 1:300
Hello, everyone
After my Polish Bridge Church is nearing completion, the next project is already on hold This time we are going to Italy, in Turin there is a particularly interesting building, the Mole Antoniellana, which houses the Italian Film Museum. It's really worth finding out about the building, I particularly like the glass elevator inside the dome The model is on a scale of 1:300 and will still be 53.5 cm high There are only 36 parts in very nice graphics on eight model construction sheets. With four pages of picture building instructions, there shouldn't be any major problems. So I'm looking forward to a model that probably won't take too much time Greetings to all architecture friends Kurt |
Google Adsense |
#2
|
||||
|
||||
and off we go...
Parts 1 and 2 ... connect Glue in intermediate ceiling 3 ... and now glue in the 1mm reinforcements Sincerely Kurt |
#3
|
||||
|
||||
I have only built one Domus kit - The Leaning Tower of Pisa - and found it a real headache. Parts fit was atrocious. Hope your experience is much better than mine! But if it isn't, I know you'll rise to the challenge, as you always do.
__________________
Give me a pigfoot and a bottle of beer. On Flickr: https://www.flickr.com/photos/153077...57692694097642 |
#4
|
||||
|
||||
Hello Philip ,
I am looking forward for a fine model , but it must not to be perfekt Parts 3 to 6...assembled and reinforced ... but do NOT assemble for the time being Sincerely Kurt |
#5
|
||||
|
||||
Now the dome ... for gluing I insert a tab inside ... ... so I can easily connect the dome segments ... Glue reinforcements inside ... and place the dome on the middle substructure ...and then glue the dome with substructure to the lowest part Sincerely Kurt |
Google Adsense |
#6
|
||||
|
||||
Parts 9 to 11 ... first reinforce with 0.9 mm Finn cardboard and 1 mm cardboard Cut out pillars, reinforce stairs... and glue behind the pillars Sincerely Kurt |
#7
|
||||
|
||||
looking good kurt.
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#8
|
||||
|
||||
Hi David , thank you
This construction phase is completed with the roof ... the lower border ... ...sit on the first plinth ...then add the staircase portal. Due to the not exactly punched parts, there are some gaps which are "spackled" with glue. Sincerely Kurt |
#9
|
||||
|
||||
Now prepare the middle border... and put the glued frame over the dome... ... the resulting gaps are filled with glue again Since the next frame is clearly too big, I split it up... and glue the segments cut to size Sincerely Kurt |
#10
|
||||
|
||||
Attach two side wings with reinforcements ... to the rear of the building Some of the pre-punched lines are imprecise, as with the two roofs. I just cut off the excess... so the roof fits again Sincerely Kurt |
Google Adsense |
|
|