PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Architectural Models

Reply
 
Thread Tools Display Modes
  #31  
Old 03-23-2023, 10:26 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello everyone

Now glue the side roof... and build the whole wall...

... as well as attaching the retaining walls.

Sincerely
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0078.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0079.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0080.jpg  
Reply With Quote
  #32  
Old 03-31-2023, 11:45 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello

The gable on the back follows...all openings cut out...

... windows and doors glued behind ... and window shutters glued on.

Best regards
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0213.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0214.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0215.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0216.jpg  
Reply With Quote
  #33  
Old 04-01-2023, 11:43 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello

Now glue the whole wall... The base for the support pillars is reinforced with 1.5mm Finn cardboard...

... and built around the pillars below ... so the building is closed for the time being.

Best regards
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0217.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0218.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0219.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0220.jpg  
Reply With Quote
  #34  
Old 04-27-2023, 09:23 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello everyone ,

there are small construction progresses again...

Now for the construction of the tower...preparing the three parts...

... and glued ... now the small columns for the balustrade, removing the tabs here and gluing them butt

Sincerely
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0047.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0048.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0055.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0056.jpg  
Reply With Quote
  #35  
Old 05-01-2023, 02:00 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello

I reinforce the railing with 0.9 mm Finn cardboard ... and put it between the columns

By cutting out the spaces in between, beautiful shadows are created ...

The railing is covered with the four parts T 7 .

Sincerely
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0057.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0058.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0001.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0002.jpg  
Reply With Quote
Google Adsense
  #36  
Old 05-09-2023, 10:28 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
and further in this theater ...

... with the roof T 8 and reinforcement T 10 ... first glue , then insert the 1mm reinforcements and glue part T 10 on the bottom .

The roof has become very stable thanks to reinforcements... Roof placed on the balustrade.

Sincerely

Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0003.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0004.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0005.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0007.jpg  
Reply With Quote
  #37  
Old 05-10-2023, 04:03 AM
Erik Zwaan's Avatar
Erik Zwaan Erik Zwaan is offline
Member
 
Join Date: Sep 2012
Location: Leiden area, The Netherlands
Posts: 2,875
Total Downloaded: 37.67 MB
This looks excellent Kurt, all the enhancements and relief you are adding to the model, especially with the windows and hatches. One thing you might consider is to also highlight the wall anchors. The coloring of this model is very attractive and the end result will be wonderful. Leon Schuijt is a paper modeling publisher from the town of Alkmaar and likely will be very pleased with your build should you send him pictures of the end result .

Cheers,
Erik
Reply With Quote
  #38  
Old 05-11-2023, 10:26 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello Erik ,

Thank you for your positive comment.
Since I would also like to be finished, I have to draw a line somewhere in the Superungen.
I am very pleased that the designer of the model liked my construction.
Of course I can send Mr. Leon Schuijt pictures after completion.

and further ...

The next floor with the clocks, frames U+V are doubled ... first prepare the 1 mm cardboard reinforcements.

The last cardboard segment is only inserted after assembly ...

I use a piece of 1.5 mm thick Finn cardboard on the back of the clocks.

Sincerely
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0008.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0019.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0020.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0021.jpg  
Reply With Quote
  #39  
Old 05-11-2023, 11:21 PM
Viator's Avatar
Viator Viator is offline
Member
 
Join Date: Aug 2021
Location: Poland
Posts: 675
Total Downloaded: 93.28 MB
Very fine model and a great job! For me it looks surprisingly realistic.
__________________
Andrew aka Viator
Reply With Quote
  #40  
Old 05-14-2023, 10:58 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hi Viator , thank you , it is a real fine model

Hello to all others ...

Now glue the clocks on... glue them together and close them at the top and bottom.

The clock segment fixed on the roof.

Sincerely
Kurt
Attached Thumbnails
Alkmaar city scales - Leon Schuijt - 1:100-dscf0022.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0023.jpg   Alkmaar city scales - Leon Schuijt - 1:100-dscf0024.jpg  
Reply With Quote
Google Adsense
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 10:43 AM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com