now continue...

Prepare wall section 43 in front of round... openings...

... and glue it.

I'll start the extension on the right side... and move step by step to the left.

With kind regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0207.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0208.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0209.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0210.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0211.jpg  

Reply With Quote
  #22  
Old 03-08-2025, 07:36 AM
rockpaperscissor's Avatar
rockpaperscissor rockpaperscissor is offline
Member
 
Join Date: Dec 2007
Location: The thriving metropolis of Wappingers Falls, NY, USA
Posts: 4,597
Total Downloaded: 136.57 MB
Impeccable craftsmanship as always. Your architecture build threads are always inspirational to me.
__________________
Regards, Don
I don't always build models, but when I do... I prefer paper. Keep your scissors sharp, my friends.
Reply With Quote
  #23  
Old 03-09-2025, 12:20 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
Hello everyone,

First of all, thank you very much for all the thumbs up from you, that's really motivating!

Hello Don, thank you, I'm happy if I can inspire other model builders!

Let's continue...

Next is the round tower, openings provided with frames, frames reinforced (1mm)... frame inserted at the bottom and 0.2 mm paper glued in for reinforcement.

Close the cylinder with the upper frame... do the same for the upper part of the tower.

For the battlements, the frames are first reinforced (0.9 mm Finn cardboard)

Kind regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0212.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0213.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0214.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0215.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0216.jpg  

Reply With Quote
  #24  
Old 03-11-2025, 12:58 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
It continues...

Glue the rings together... until the platform is finished.

Now assemble the thirty-nine pinnacles, removing all the tabs and gluing them together...
let the thirty-nine pinnacles dry thoroughly.

Kind regards,

Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0001.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0028.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0029.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0030.jpg  
Reply With Quote
  #25  
Old 03-13-2025, 12:28 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
Hello...

The platform has been placed on top and glued.

Before the battlements are installed, parts 74/76 still need to be attached... Glue the border step by step...

... insert the panels... all fifty panels installed.

Best regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0031.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0032.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0033.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0034.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0035.jpg  

Reply With Quote
Google Adsense
  #26  
Old 03-14-2025, 12:25 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
Continuing on with this construction site...

Now add the thirty-nine battlements... and glue the two tower segments together...

... glue strip 75 between them.

Parts 82/83... are placed at the top of the tower.

Best regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0001.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0002.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0003.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0004.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0005.jpg  

Reply With Quote
  #27  
Old 03-15-2025, 12:37 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
Hello everyone,

Place the finished tower in the castle courtyard... Part 77 shows a rocky section...

... which will be covered with grass... grass is also growing in the upper corner.

Best regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0006.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0007.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0008.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0009.jpg  
Reply With Quote
  #28  
Old 03-16-2025, 01:18 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
Further on...

The next staircase... leads to the tower entrance.

Reinforce part 81 with 0.8 mm cardboard... and attach it to the base of the tower, then cover it with grass and gravel.

A view of the castle courtyard.

Best regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0010.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0011.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0012.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0013.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0017.jpg  

Reply With Quote
  #29  
Old 03-16-2025, 07:45 AM
Michael Mash's Avatar
Michael Mash Michael Mash is offline
POTM Moderator
 
Join Date: Oct 2008
Location: The Great Lakes
Posts: 5,850
Total Downloaded: 19.69 MB
The stone textures look so realistic in your photos.
Excellent work Kurt.
Mike
Reply With Quote
  #30  
Old 03-17-2025, 12:07 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is online now
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,447
Total Downloaded: 0
Hello Mike , thank you

Wall section 47 with 1mm reinforcement... closes off the castle courtyard.

Outbuilding 51... insert into the curve.

Best regards,
Kurt
Attached Thumbnails
​Bedzin Castle / Poland - GPM - 1:160-dscf0025.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0026.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0027.jpg   ​Bedzin Castle / Poland - GPM - 1:160-dscf0037.jpg  
Reply With Quote
Google Adsense
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 06:27 AM.


Powered by vBulletin®
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com