Been busy buiding up the frame work pieces.

The right side turret is a tight fit into the main frame. this may be due to a slight overthickness (new word?) of the illustration board I used for lamination, but I'm not sure of that as the turret skin fit flush at the top and bottom of its subassembly.

I replaced the paper pins for this turret and the main turret gun mount with plastic rod for durability and ease of assembly.

The frame is very rigid. I think it is even more so that the frame for GPM's Lee.

Next up I get to start skinning the hull. So far so good.

greg
Attached Thumbnails
A project in three acts-img_20140407_180956_586-1-.jpg   A project in three acts-img_20140407_182551_878-1-.jpg   A project in three acts-img_20140407_182602_911-1-.jpg   A project in three acts-img_20140407_200305_343-1-.jpg   A project in three acts-img_20140407_200311_413-1-.jpg  

A project in three acts-img_20140407_200319_546-1-.jpg  
__________________
In dry dock: ? In factory: CWS T-1. In hanger: Fokker triplanes? under construction: ?
Reply With Quote
  #12  
Old 04-08-2014, 02:46 PM
enrico63's Avatar
enrico63 enrico63 is offline
Member
 
Join Date: Mar 2012
Location: Ispra, provincia di Varese
Posts: 979
Total Downloaded: 11.18 MB
It 'a subject that I like!! I'm waiting to see how go on the work
__________________
Enrico
Under construction: Fiat 6605 AG70 crane truck
All my models and download on e63papermodel.Latest uploads:Fiat 6605 TM69
Reply With Quote
  #13  
Old 04-09-2014, 08:05 PM
KCStephens's Avatar
KCStephens KCStephens is offline
Member
 
Join Date: Dec 2007
Location: York, Pennsylvania
Posts: 2,252
Total Downloaded: 678.6 KB
It really looks great so far Greg. Keep those photos coming - this thread will be very helpful in the future when I tackle this model.
Reply With Quote
  #14  
Old 04-09-2014, 08:48 PM
modelperry's Avatar
modelperry modelperry is offline
Member
 
Join Date: Feb 2008
Location: Burlington, Iowa
Posts: 2,828
Total Downloaded: 10.41 MB
Skinning has begun. The main skins are fitting very well so far. Two minor issues though. The sloped portions of the rear top skin and the underside of the fenders have no real solid connection to the framework. Mostly edge glued only for these areas. Not so bad for the fender areas but possible sag issues for the top piece areas over time.

Also, the rear tie down lug locating marks are misplaced too low. A dab of color will cover up these areas.

Greg
Attached Thumbnails
A project in three acts-img_20140409_205348_377.jpg   A project in three acts-img_20140409_205410_494.jpg  
__________________
In dry dock: ? In factory: CWS T-1. In hanger: Fokker triplanes? under construction: ?
Reply With Quote
  #15  
Old 04-10-2014, 08:21 AM
Don Boose's Avatar
Don Boose Don Boose is offline
Member
 
Join Date: Jul 2007
Location: Carlisle, Pennsylvania
Posts: 20,748
Total Downloaded: 424.90 MB
Fine craftsmanship.

Interesting Dave Winfield-inspired discussion of white locating marks in Kevins Dragon Wagon thread.

Don
Reply With Quote
Google Adsense
  #16  
Old 04-14-2014, 09:33 AM
modelperry's Avatar
modelperry modelperry is offline
Member
 
Join Date: Feb 2008
Location: Burlington, Iowa
Posts: 2,828
Total Downloaded: 10.41 MB
More progress! Saturday was a non-building day for me as I attended an IPMS contest in Des Moines. I did get a third place in military vehicles for my Komatsu Dozer. This was nice considering I was not expecting to win even a third place at this event.

I did work on the Grant yesterday with some success. Here are pictures to get everyone up to date.

I will say that there were a few parts not marked for lamination that I did laminate to 1 mm. This provided adequate glue surface for connecting parts. I thought it was kind of obvious where this would be beneficial so I had no issues with this omission. The inside vertical pieces of the drive housing and part 56, the turret top plate should all be laminated on 1 mm to improve the build. Also, the front tiedown lugs had no locating marks so I used the Lee as reference for location.

greg
Attached Thumbnails
A project in three acts-img_20140413_170022_861-1-.jpg   A project in three acts-img_20140413_170034_032-1-.jpg   A project in three acts-img_20140413_170049_398-1-.jpg   A project in three acts-img_20140413_182306_825-1-.jpg  
__________________
In dry dock: ? In factory: CWS T-1. In hanger: Fokker triplanes? under construction: ?

Last edited by modelperry; 04-14-2014 at 10:27 AM. Reason: added more info.
Reply With Quote
  #17  
Old 04-14-2014, 11:09 AM
Vermin_King's Avatar
Vermin_King Vermin_King is offline
Member
 
Join Date: Jun 2011
Location: Kansas City
Posts: 11,590
Total Downloaded: 582.17 MB
Shaping up very nicely
__________________
A fine is a tax when you do wrong.
A tax is a fine when you do well.
Reply With Quote
  #18  
Old 04-14-2014, 03:23 PM
romanmodels's Avatar
romanmodels romanmodels is offline
Member
 
Join Date: Nov 2011
Location: Nr Devizes Wilts uk
Posts: 2,332
Total Downloaded: 14.63 MB
makeing good progress.
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9

Reply With Quote
  #19  
Old 04-15-2014, 06:14 AM
modelperry's Avatar
modelperry modelperry is offline
Member
 
Join Date: Feb 2008
Location: Burlington, Iowa
Posts: 2,828
Total Downloaded: 10.41 MB
Thanks everyone for the encouragement. Some more progress last night. The Idler wheel mounts are built and installed. The diagrams for these are spread between two pages and are a mix of each side (59 left side and 60 right) with no cohesive link between them. So I'll fix that here with several shots of the left hand assembly to help with orientation.

greg
Attached Thumbnails
A project in three acts-img_20140414_192044_626-1-.jpg   A project in three acts-img_20140414_192054_203-1-.jpg   A project in three acts-img_20140414_192105_405-1-.jpg   A project in three acts-img_20140414_192114_874-1-.jpg   A project in three acts-img_20140414_194638_092-1-.jpg  

A project in three acts-img_20140414_194648_406-1-.jpg  
__________________
In dry dock: ? In factory: CWS T-1. In hanger: Fokker triplanes? under construction: ?

Last edited by modelperry; 04-15-2014 at 06:47 AM.
Reply With Quote
  #20  
Old 04-15-2014, 06:21 AM
jagolden01's Avatar
jagolden01 jagolden01 is offline
Member
 
Join Date: Jan 2008
Posts: 2,529
Total Downloaded: 37.84 MB
Nice work, Greg! And moving right aling, tooM

Joe
__________________
Currently building Heinkel Models/Ron Miller Authentic Nautilus.
Reply With Quote
Google Adsense
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 07:49 PM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com