#11
|
|||
|
|||
The beginning looks promising. Very nice work.
YOAV |
#12
|
|||
|
|||
out standing build big well done sir
|
#13
|
||||
|
||||
The work continues:
The brackets for the control cables, which are still missing on the tails I will attach them later. Otherwise they could break off too easily. The construction of the lower wing is shown very clearly in sketch 18. The left half should be built first. The right half is then almost only a repetition. |
#14
|
||||
|
||||
I can only report positive things about the accuracy of fit.
Also the sensible sequence of the construction is excellent from the sketches. I am very enthusiastic about the very well thought-out and for the modeler well comprehensible construction. |
#15
|
||||
|
||||
Now attach the lower wings to the fuselage of the airplane. Sketch 19
The doubled spar parts are to be pushed through the fuselage and fixed. Now the wing parts on the right and left can easily be slid over the spars and glued to the fuselage. and glued to the fuselage. Everything fits wonderfully!!! Last edited by A. Pirling; 10-20-2021 at 03:35 PM. |
Google Adsense |
#16
|
||||
|
||||
Now follow two exhaust pipes - parts 140, 135, 136 and139 and 137, 138, 142 and 143.
In addition, parts for the propeller bearing at the bow have to be prepared and attached - parts 23, 171 and 172. Components 23, 171 and 172. Sketch 20 |
#17
|
||||
|
||||
This card seems to have an attractive shiny finish.
It looks very good. Mike |
#18
|
||||
|
||||
I agree with Mike.
Thank you for sharing! |
#19
|
||||
|
||||
You build a very fine airframe, nicely done.
|
#20
|
||||
|
||||
rifleman
YOAVHOZMI Rata, Wireandpaper Michael Mash Don Boose MacSongli Mike 1158 I would like to thank you all very much for your comments and kind words. They are a great recognition for me. What the applause of the audience means to the actor on stage, your words mean to me as a model maker. Adolf Pirling |
Google Adsense |
|
|