#11
|
||||
|
||||
Hello!
The construction of the minor boats continues. Here you see the small launch "Piet".
__________________
Currently building: - HMV EGV Berlin 1:250 |
#12
|
||||
|
||||
and then the second barge, which is the last and the largest of the four boats.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#13
|
||||
|
||||
This barge is quite detailed, considering the small size.
Here you see the bollards, the rudder, a which and the completed model. Cheers, Tommaso
__________________
Currently building: - HMV EGV Berlin 1:250 |
#14
|
||||
|
||||
of course it's a winch, but I cannot edit it...
__________________
Currently building: - HMV EGV Berlin 1:250 |
#15
|
||||
|
||||
Looks like fun - plenty of variety.
Its nice being able to finish a model within a model so to speak! |
Google Adsense |
#16
|
||||
|
||||
Hi all!
Here there is still a general view of the four small boats, which I will then put aside for a while.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#17
|
||||
|
||||
and now it's time to begin the real harbor!
The first stage is the construction of the lower level; here you can see the base (reinforced with 2mm cardboard), the structure and the covers of the level, which includes the railway at the front and the inner floor of the harbor building.
__________________
Currently building: - HMV EGV Berlin 1:250 |
#18
|
||||
|
||||
...then the walls on the back sides of the harbor are glued in place.
Here you can see a few details of the first level. Cheers, Tommaso
__________________
Currently building: - HMV EGV Berlin 1:250 |
#19
|
||||
|
||||
Hello!
The construction of the harbor building continues. I have installed the front walls, the doors and the internal frames of the building. Cheers, Tommaso
__________________
Currently building: - HMV EGV Berlin 1:250 |
#20
|
||||
|
||||
Beautiful work, as always, Tommaso!
The harbor craft are very nicely done and the harbor itself looks very realistic. This is a major project! Don |
Google Adsense |
|
|