#21
|
||||
|
||||
Over Easter I've been able to build more levels, and now I'm finally on an internet connection that works. I am up to level 13 now. I have also pre-cut the rest of the railings (fresh blades from my home leave!), and I'm now touching up the exterior with red paint as I go, because the printed red colour is not vibrant enough.
__________________
Recently finished: St. Peter's & Vatican - 1:3900 - Micromodels |
#22
|
||||
|
||||
Apart from pipes and cables, the tower is now complete. Next will be the swing arms and the hammerhead crane.
__________________
Recently finished: St. Peter's & Vatican - 1:3900 - Micromodels |
#23
|
||||
|
||||
Now that's what i call NICE ! very clean and crisp thus far. Looking forward to the next update
|
#24
|
||||
|
||||
I love this thread - This is absolutely outstanding model - and your job
__________________
Per Aspera Ad Astra |
#25
|
||||
|
||||
Thanks! I've started on the pipes on the outside of the LUT - the best results are obtained with white drinking straws. Photos will follow soon.
__________________
Recently finished: St. Peter's & Vatican - 1:3900 - Micromodels Last edited by Marco; 04-13-2010 at 12:55 AM. |
Google Adsense |
#26
|
||||
|
||||
And here are the pipes on the side of the LUT, and the first of the pipes at the back. White drinking straws were used.
__________________
Recently finished: St. Peter's & Vatican - 1:3900 - Micromodels |
#27
|
||||
|
||||
Just the job... those straws do the trick, and it looks splendid
|
#28
|
||||
|
||||
Here's the rest of the cables, and a test fit on the crawler transporter.
__________________
Recently finished: St. Peter's & Vatican - 1:3900 - Micromodels |
#29
|
||||
|
||||
The Colby hammerhead crane is now also ready. The swing arms will follow next.
__________________
Recently finished: St. Peter's & Vatican - 1:3900 - Micromodels |
#30
|
|||
|
|||
Spectacular work well done
How many sheets were printed in total? John John |
Google Adsense |
|
|