#1
|
||||
|
||||
HMS Belfast 1:400 JSC
Last August, we visited England and I just had to take the opportunity to visit the HMS Belfast. Of course, then this winter, I had to try my hand at building the JSC kit of the Belfast.
Launched in 1938, the Belfast struck a German mine in 1939 and had to have extensive repairs completed before returning to action in 1942. She assisted in the destruction of the Scharnhorst and supported the D-Day invasion. Beyond WWII, she served in the Korean War and was placed in reserve in 1963. Several years later, she was turned into a floating museum and resides on the Thames. The second photo is one that I took as I left the ship.
__________________
Mike Current builds: St Luke's Church |
Google Adsense |
#2
|
||||
|
||||
The photos of the completed model.
I almost gave up on the plane but with a few adjustments, It seemed to come out okay. Please excuse my photographic skills.
__________________
Mike Current builds: St Luke's Church |
#3
|
||||
|
||||
looks good. jsc aircraft are a challenge, the small parts and they use the cover stock as the paper used for forming.
|
#4
|
||||
|
||||
Thanks CMDRTED,
you're right...not only was the size the issue but the stock did not help either. They gave the parts for two planes but I made a mistake or two on the first one and had to use the second plane for parts!!
__________________
Mike Current builds: St Luke's Church |
#5
|
||||
|
||||
lesson one of card models.always scan everything before you build in case of botch ups
__________________
Carborundum Illegitimi Ne Herky |
Google Adsense |
#6
|
||||
|
||||
Looks very nice!
How long did your build take?
__________________
The SD40 is 55 now! |
#7
|
||||
|
||||
flymodel also have a model of belfast at 1;200 scale
__________________
Carborundum Illegitimi Ne Herky |
#8
|
||||
|
||||
Herky,
There seem to be a few #1 tips that I haven't mastered yet with regard to paper modeling, but one of these days...maybe. Actually that would have been easy to do but I just plowed forward. Thanks for the tip on flymodel.
__________________
Mike Current builds: St Luke's Church |
#9
|
||||
|
||||
Kevin,
Thanks. As for time...that is hard for me to estimate. I started in the late fall but several times I put it on the shelf due to other commitments or I wanted to try my hand at other builds, like cathedrals. I'm afraid if I kept track of my time, I would worry about it but since this is my hobby, I don't keep track and just enjoy the time spent modeling.
__________________
Mike Current builds: St Luke's Church |
#10
|
||||
|
||||
Thanks Mike!
__________________
The SD40 is 55 now! |
Google Adsense |
|
|