#51
|
||||
|
||||
![]() The parts do not increase in size ... and are attached to the upper deck . Items 62 to 65 ... Attached to port side. Sincerely Kurt |
#52
|
||||
|
||||
![]() Parts 68/69, benches for the team... and a table for snack time... ... set up in a wind-protected angle on board. Sincerely Kurt |
#53
|
||||
|
||||
![]() More small parts ... distributed on the starboard side . With the railing installed, construction phase 24 is complete. Sincerely Kurt |
#54
|
||||
|
||||
![]() Construction phase 25 ... first part 73, the elevator with 30 individual parts. Elevator frame with basket ... installed in the gap in the ship's side. And further in this order of magnitude ... placed behind the elevator . Sincerely Kurt |
#55
|
||||
|
||||
Hi !
I'm looking forward to construction phase 26 with excitement ... a three centimeter long inflatable boat with 69 parts! Glue the hull with small tabs and prepare the bottom of the boat. Sincerely Kurt ![]() |
Google Adsense |
#56
|
||||
|
||||
Terrific work on fabrication of deck equipment and details Kurt.
|
#57
|
||||
|
||||
Thank you shipbuild
![]() Hello, everyone ... I use a piece of toothpick as a guide between the individual parts of the hose... interim report. Now put on the keel ... so the dinghy is floatable. Sincerely Kurt |
#58
|
||||
|
||||
Hello, everyone
![]() Continue with the superstructure ... Control cabin ... ... and propeller ... done . Without words and kind regards Kurt |
#59
|
||||
|
||||
Very impressive fine details !
|
#60
|
||||
|
||||
The amount of small detail is impressive, so is the construction of it
|
Google Adsense |
![]() |
Thread Tools | |
Display Modes | |
|
|