PaperModelers.com

Go Back   PaperModelers.com > Card Models > Model Builds > Ships and watercraft

Reply
 
Thread Tools Display Modes
  #51  
Old 12-17-2022, 12:35 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


The parts do not increase in size ... and are attached to the upper deck .

Items 62 to 65 ... Attached to port side.

Sincerely
Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0143.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0144.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0145.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0149.jpg  
Reply With Quote
  #52  
Old 12-18-2022, 12:48 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


Parts 68/69, benches for the team... and a table for snack time...

... set up in a wind-protected angle on board.

Sincerely

Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0150.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0152.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0153.jpg  
Reply With Quote
  #53  
Old 12-25-2022, 11:35 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


More small parts ... distributed on the starboard side .

With the railing installed, construction phase 24 is complete.

Sincerely
Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0154.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0208.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0209.jpg  
Reply With Quote
  #54  
Old 12-30-2022, 12:13 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0


Construction phase 25 ... first part 73, the elevator with 30 individual parts.

Elevator frame with basket ... installed in the gap in the ship's side.

And further in this order of magnitude ... placed behind the elevator .

Sincerely
Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0210.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0211.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0212.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0213.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0214.jpg  

Zollkreuzer Helgoland - HMV - 1:250-dscf0215.jpg  
Reply With Quote
  #55  
Old 01-12-2023, 11:55 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hi !

I'm looking forward to construction phase 26 with excitement ... a three centimeter long inflatable boat with 69 parts!

Glue the hull with small tabs and prepare the bottom of the boat.

Sincerely

Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0216.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0217.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0307.jpg  
Reply With Quote
Google Adsense
  #56  
Old 01-12-2023, 09:16 PM
shipbuild's Avatar
shipbuild shipbuild is offline
Member
 
Join Date: Sep 2012
Location: New England
Posts: 429
Total Downloaded: 58.25 MB
Terrific work on fabrication of deck equipment and details Kurt.
Reply With Quote
  #57  
Old 01-18-2023, 01:00 PM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Thank you shipbuild

Hello, everyone ...

I use a piece of toothpick as a guide between the individual parts of the hose... interim report.

Now put on the keel ... so the dinghy is floatable.

Sincerely
Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0327.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0328.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0329.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0330.jpg  
Reply With Quote
  #58  
Old 01-22-2023, 12:54 AM
Styrian Spitfire's Avatar
Styrian Spitfire Styrian Spitfire is offline
Member
 
Join Date: Feb 2014
Location: Styria
Posts: 2,109
Total Downloaded: 0
Hello, everyone

Continue with the superstructure ... Control cabin ...

... and propeller ... done .

Without words and kind regards
Kurt
Attached Thumbnails
Zollkreuzer Helgoland - HMV - 1:250-dscf0331.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0332.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0334.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0335.jpg   Zollkreuzer Helgoland - HMV - 1:250-dscf0336.jpg  

Reply With Quote
  #59  
Old 01-24-2023, 09:05 AM
shipbuild's Avatar
shipbuild shipbuild is offline
Member
 
Join Date: Sep 2012
Location: New England
Posts: 429
Total Downloaded: 58.25 MB
Very impressive fine details !
Reply With Quote
  #60  
Old 01-25-2023, 04:13 AM
Bluenoser's Avatar
Bluenoser Bluenoser is offline
Member
 
Join Date: Jul 2007
Location: Nova Scotia
Posts: 891
Total Downloaded: 55.56 MB
The amount of small detail is impressive, so is the construction of it
Reply With Quote
Google Adsense
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 08:56 AM.


Powered by vBulletin®
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

Parts of this site powered by vBulletin Mods & Addons from DragonByte Technologies Ltd. (Details)
Copyright © 2007-2023, PaperModelers.com