#21
|
||||
|
||||
Extraordinarily realistic bogies!
Don |
#22
|
||||
|
||||
That assembly is impressive David.
Mike |
#23
|
|||
|
|||
cant wait for the next batch of photos looking great well done
|
#24
|
||||
|
||||
thanks, Don,Mike and rifleman
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#25
|
||||
|
||||
Up next the brakes
brake pads that should of been wider but i forgot to add a strip on both sides of the pads fond the parts hiding under some scrape card i had saved for laminating at the end of the build !!! Other brake parts and fixst in place till next time.
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
Google Adsense |
#26
|
||||
|
||||
The intricacy of those assemblies is remarkable.
Very well done. Mike Last edited by Michael Mash; 10-09-2021 at 04:58 PM. |
#27
|
||||
|
||||
Thanks, Mike, all most a pity to cover them up with the rest of the loco
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#28
|
||||
|
||||
Vertshaly the last bit of work on bogies.
some spikes are the only kit parts the rest are scratch parts brakes springs and hand brake linkages. pipework and cables added. side view showing some of the hand brake linkage added. scratch building conserteener connection for the traction motor air cooling duct. fixed the bogie connector in place. air ducts fixed in place. that's it for the bogies for now on to the body again of the loco.
__________________
David........... Paper modelling gives you a happy high. currently building. c GAZ 51 ALG 17, wagon 111a. unex DH411 excavator and spitfire Mk 9 |
#29
|
|||
|
|||
awesome work sir well done
|
#30
|
||||
|
||||
Impressive work David.
Mike |
Google Adsense |
|
|